Marca: Hotpoint

Hotpoint Fabric Care 9kg Heat Pump Tumble Dryer - C HD 94M WBS UK

405,54 €697,90 €41% OFF
Cantidad

Descripción

  • Heat Pump Design
  • 9kg Drum Capacity
  • PetHairCare
  • HomeWhiz App Connection
  • FastDry - 5kg Dry in 1hr
  • 16 Drying Programmes
  • Annual Energy Consumption: 194
  • Colour Of Unit: White
  • Condenser Efficiency Grade: A
  • Dryer Temperatures: 5
  • Energy Efficiency Class: A+++
  • Energy Full Load: 1.06
  • Energy Half Load: 1.06
  • Energy Rating: A+++
  • Filter Full Indicator: Yes
  • Final Cool Cycle: No
  • Full Load Cycle Time in mins: 3:15
  • Half Load Cycle Time in mins: 2:00
  • Half load option: No
  • Heat Pump: Yes
  • Loading Type: Front
  • Max Time on Timer in mins: 1440
  • Noise Level: 64
  • Number of programmes: 15
  • Sensor Drying: Yes
  • Smart Dryer: Yes
  • Timer delay: Yes
  • Time remaining indicator: Yes
  • Tumble Dryer Type: Heat Pump
  • Vent Hose Included: No
  • Venting Position: Front
  • Load Capacity in kg: 9
  • Height in mm: 846
  • Width in mm: 598
  • Depth in mm: 672
  • Weight in kg: 45
  • Guarantee: 1 Year